VVS Waterproofing
Finished tiled terrace laid to falls over a completed VVS waterproofing build-up — Sydney waterproofing project

Waterproofing
+ Tiling.

One coordinated team from substrate preparation through to the finished tiled surface.

Waterproofing + Tiling in Sydney & Greater Sydney

Class 1 · Class 2 · Class 3 Buildings — NSW

Where both scopes form part of our package, the team that waterproofs the area also tiles it. Fewer trade interfaces, better coordination and greater control over membrane protection and sequencing.

The build-up is treated as one system: substrate, screed, membrane, bedding, tile and movement joints.

Scope of Works

  • Rip-out and substrate preparation
  • Remedial screeds and falls
  • Membrane installation and detailing
  • QA and flood testing
  • Tile bedding and installation
  • Grouting, sealing and handover

Recent Waterproofing + Tiling Work — Sydney

Completed tiled balcony over the finished waterproofing build-up — Sydney waterproofing project
Tiling underway with levelling clips across a balcony floor — Sydney waterproofing project
Completed tiled balcony with drainage outlets and finished edges — Sydney waterproofing project

Detail

What Matters Here.

One interface

No dispute between waterproofer and tiler over damage, timing or responsibility for the build-up.

Protection

The membrane is protected by the team that installed it, right up to bedding.

Movement

Movement joints carried through the tiling to match the joints below it.

Before You Request a Quote

What to Send Us

For a waterproofing + tiling quote, these details help us scope and price the work.

  1. 01Site address and areas — balcony, terrace, bathroom or podium
  2. 02Tile selection, size and adhesive or bedding requirements
  3. 03Drawings or photos showing falls, outlets and thresholds
  4. 04Whether existing tiles need removal
  5. 05Access and preferred programme

Let's Build It
Watertight.

CallPrice Project