Waterproofing packages delivered on commercial construction programmes, from base build through to handover.

Commercial Waterproofing in Sydney & Greater Sydney

Class 1 · Class 2 · Class 3 Buildings — NSW

Commercial waterproofing is a sequencing problem as much as an application problem. Membranes are installed at the correct hold point, protected immediately, and handed to the following trade in the condition the specification requires.

We work to the project documentation — specification, manufacturer requirement and programme — and issue the records the project team needs as the works progress.

Scope of Works

  • Podium and plant deck membranes
  • Basement and lift pit tanking
  • Roof and terrace systems
  • Wet area and amenity waterproofing
  • Movement and construction joint detailing
  • Progressive QA and ITP documentation

Recent Commercial Waterproofing Work — Sydney

Large commercial deck prepared for membrane installation — Sydney waterproofing project
VVS site presence on a commercial construction project — Sydney waterproofing project
Membrane applied across a commercial deck area — Sydney waterproofing project

Detail

What Matters Here.

Sequencing

Coordinated with formwork, hydraulics, structure and finishing trades so the membrane is never left exposed or trafficked before protection is installed.

Documentation

SWMS, ITPs, product data sheets and photographic evidence issued as part of the works.

Testing

Flood testing carried out and recorded before screeds, overburden or tiling are placed.

Before You Request a Quote

What to Send Us

For a commercial waterproofing quote, these details help us scope and price the work.

  1. 01Site address and building class
  2. 02Architectural and hydraulic drawings, specification and finishes schedule
  3. 03Areas in scope — podium, roof, basement, wet areas — with approximate m²
  4. 04Site access, hoist or crane availability and working hours
  5. 05Programme dates and hold points for the waterproofing stage