07 — Bathrooms, laundries, amenities
Wet Area Systems
Internal wet areas use cementitious or liquid membranes over prepared substrates, with bond breakers at junctions and flood testing before tiling. Most wet area failures come from junctions, hobs and penetrations, not the field.
Typically specified for
- Bathrooms, ensuites and laundries
- Commercial amenities and change rooms
- Kitchens, plant rooms and bin rooms
- Shower recesses and step-down floors
Design considerations
- Substrate must be sound, dry and correctly fixed
- Falls to waste confirmed before membrane
- Coordination with hydraulic and tiling trades
- Flood test held before tile bedding
VVS installation sequence
- 01Bond breakers to all wall-floor junctions
- 02Sealed penetrations at wastes and tapware
- 03Membrane turned up to specified heights
- 04Flood test with photographic record