
Screeds
& Falls.
The preparation beneath the membrane. Substrate correction, remedial screeds and falls to drainage.
Screeds & Falls in Sydney & Greater Sydney
Class 1 · Class 2 · Class 3 Buildings — NSW
A membrane can only bond to what is underneath it, and it can only shed water if the surface falls to a drain. Preparation is where most waterproofing outcomes are decided.
We grind, repair, re-fall and prime as a documented stage of the works rather than an assumption made by the trade that follows.
Scope of Works
- Grinding and mechanical preparation
- Laitance and contamination removal
- Crack routing and structural patching
- Remedial screeds to correct falls
- Set-downs, hobs and thresholds
- Priming to the system requirement
Recent Screeds & Falls Work — Sydney



Detail
What Matters Here.
Substrate
Moisture content, laitance, contamination and cracking assessed and corrected before priming.
Falls
Flat or reversed falls are rebuilt so water reaches the outlet under the finished surface.
Interfaces
Set-downs and thresholds set to allow compliant upstand heights and finished floor levels.
Before You Request a Quote
What to Send Us
For a screeds & falls quote, these details help us scope and price the work.
- 01Site address and area to be screeded (approximate m²)
- 02Photos showing ponding or existing levels
- 03Outlet locations, thresholds and finished floor level constraints
- 04Intended membrane and finish above the screed
- 05Access and timing, including curing time before the next trade
