Class 2 Waterproofing — Apartments and Multi-Residential

Why Class 2 buildings concentrate waterproofing risk, and how staged balcony, podium and wet area works are typically delivered.

Repetition multiplies defects

A detail repeated across a hundred balconies repeats its consequences too. Prototyping and inspecting the first areas of each type is far cheaper than rectifying the whole building later.

Occupied buildings

Remedial work on Class 2 buildings runs around residents. Access, staging, noise, odour and reinstatement have to be planned with the strata manager or builder before the first tile is lifted.